Portfolio of past completed and current projects
Joint User Complex with Market in Area 67, Tseung Kwan O
Complete plumbing and drainage installations for the building consisting of 12 above-ground levels, 2 level basements with parking facilities and a 3-level market with 143 stalls. The new complex will adopt the latest MIC (Modular integrated Construction) technology coupled with DfMA (Design for Manufacture and Assembly) principles to enhance building quality, improve site safety and reduce wastage and construction time
Architectural Services Department
Kwu Tung North Community Liaison Centre
Plumbing & Drainage Installation for Kwu Tung North Community Liaison Centre
Civil Engineering and Development Department
Public Housing Development at Ching Hiu Road, Sheung Shui
Public Housing Development of 1 Block (624 flats) at Ching Hiu Road, Sheung Shui, N.T.
Hong Kong Housing Authority
West New Territories Landfill Extension - Construction of Plumbing and Drainage Systems
Construction of Plumbing and Drainage Systems in West New Territories Landfill Extension
Civil Engineering and Development Department
Redevelopment of Kwong Wah Hospital (Phase 2)
Complete plumbing & drainage installations for the hospital project, which comprises demolition of all its existing buildings in phases, construction of a new complex, alteration/addition works to TWGHs Tsui Tsin Tong Outpatient Building, Landscaping and road works
Hospital Authority
No.15 Ventris Road, Happy Valley
Complete plumbing & drainage installation for the residential building
Wheelock Properties (HK) Ltd
Beacon Heights - Additions & Alterations Works
Beacon Heights - Additions & Alterations Works
Shanghai Commercial Bank Building, Mongkok - Addition & Alteration Works
Addition & Alteration Works of the Plumbing and Drainage Installations for Shanghai Commercial Bank Building (25 storeys) at 666 Nathan Road, Mongkok.
Shanghai Commercial Bank
Pok Fu Lam South - Design, Supply & Installation of Sump Pump to Elevator Sump Pit for Site Formation & Infrastructure Works
Design, Supply & Installation of Sump Pump to Elevator Sump Pit for Site Formation & Infrastructure Works in Pok Fu Lam South
Civil Engineering and Development Department
Chai Wan WSD Headquarters and CSD Headquarters
Complete plumbing and drainage installations for 2 nos. of 10-storey high WSD & CSD headquarters tower on 3-storey podium and 1-storey basement structure. The new complex will adopt the latest MIC (Modular integrated Construction) technology coupled with DfMA (Design for Manufacture and Assembly) principles to enhance building quality, improve site safety and reduce wastage and construction time
Architectural Services Department
No.5 Mount Cameron Road, The Peak
Complete plumbing & drainage installation for the 24-storey residential tower.
Swire Properties Limited
Ping Lan Street, Ap Lei Chau Main Street
Complete plumbing & drainage installation for the building
Wang On Properties Ltd.
Kotewall Road, Mid-level West
Complete plumbing & drainage installation for the 21-storey residential tower
Lai Sun Group
No.70 Black's Link - Provision of Plumbing & Drainage Systems
No.70 Black's Link - Provision of Plumbing & Drainage Systems
Or Keung Kee
Lee Garden 3 16/F~18/F 清洗泵缸及潛水泵保養合約 32個月 202308~202603
Lee Garden 3 16/F~18/F 清洗泵缸及潛水泵保養合約 32個月 202308~202403
Tower Watson Hong Kong Limited
雅蘭中心1期18樓1801C(清洗隔油缸)
Taikoo Place-One Island East - Supply & Delivery of Pipe Fitting
Taikoo Place-One Island East - Supply & Delivery of Pipe Fitting
Shek Kwu Chau Integrated Waste Management Facilities
Complete plumbing and drainage installations for the Integrated Waste Management Facilities (IWMF), which aims to substantially reduce the bulk size of mixed municipal solid waste (MSW) and to recover useful resources. It will minimize the landfilling of waste significantly, thereby extending the useable life of landfills and their extensions in Hong Kong
Environmental Protection Department
Siu Sai Wan Health Centre and Social Welfare Facilities Building
Complete plumbing and drainage installations for the building of health centre and social welfare facilities
Architectural Services Department
Aviation and Maritime Education Center of Vocational Training Council
Complete plumbing and drainage installations for the 8-storey education building of VTC, comprising of workshops, simulated teaching environment and associated supporting facilities
Vocational Training Council
Hotel development at Gage Street / Graham Street
Complete plumbing & drainage system and centralized hot water system for a hotel project
Wing Tai Properties Ltd.
Commercial development at 31-37, Hankow Road, Tsim Sha Tsui
Complete plumbing & drainage installation for the commercial building development consisting of 20-storey commercial floors and 1-level basement car parks
Lofter Group
Discovery Bay (Phase 19)
Complete plumbing & drainage installation for the residential project of Hong Kong Resort, consisting of six 15-storey residential towers and four 5-storey residential towers.
Hong Kong Resort Co., Ltd.
Catchick Street, Kennedy Town
Complete plumbing & drainage installation for the 25-storey residential building (125 flats) with G/F car parks, retail and F&B shops at G/F to 1/F, and Club House at 2/F.
Success Mark Investment Ltd. (Eminence Enterprise)
Yee Kuk Street, Sham Shui Po
Complete plumbing & drainage installation for the 24-storey residential tower.
Sun Fai Investment Development Limited
Tsuen Wan Public Library - Plumbing and Drainage A & A Works in Renovation
Plumbing and Drainage A & A Works in Renovation of Tsuen Wan Public Library
Architectural Services Department
Mira Place - various A & A maintenance works
Mira Place -various A & A maintenance works
Mount Anderson - MEP defects and O/S works for Plumbing and Drainage Installation
Mount Anderson - MEP defects and O/S works for Plumbing and Drainage Installation
Chinachem Group
26F Shouson Hill Road (For maintenance)
Shek Wu Hui Effluent Polishing Plant
Complete plumbing and drainage installations for Sidestream Treatment Facilities and E&M Works for Sludge Treatment Facilities of Shek Wu Hui Effluent Polishing Plant
Drainage Services Department
Kowloon Tsai Swimming Pool
Complete plumbing & drainage installations and central hot water systems for the redevelopment of the existing public swimming pool complex inside Kowloon Tsai Park, consisting of an standard indoor competition pool, spectator stand for 1500 persons, an outdoor training pool, an outdoor children pool, an outdoor sun bathing deck, and associated changing room and pool management facilities
Architectural Services Department
Verano, Repulse Bay Road
Complete plumbing & drainage installation for the 12-storey residential tower of 14 flats.
Joyful Colour Limited
6 Deep Water Bay Road
Complete plumbing & drainage installation for 2 nos. of 2-storey luxury houses with 1 level of car park.
Swire Properties Limited
Spring Garden, Wanchai
Complete plumbing & drainage installation for the residential project of Wheelock Group, consisting of a 22-storey residential tower (88 flats) with retail and club house.
Wheelock Properties (HK) Ltd
33 Kennedy Road, Wanchai
Complete plumbing & drainage installation for the residential project of Swire Group, consisting of a 26-storey residential tower (69 flats) with retail and club house.
Swire Properties Limited
Sai Wan Ho Civic Centre - Plumbing and Drainage A & A Works in Renovation and Improvement Project
Plumbing and Drainage A & A Works in Renovation and Improvement Project of Sai Wan Ho Civic Centre
Architectural Services Department
Lucky Plaza - Plumbing and Drainage A & A Works in the Renovation
Lucky Plaza - Plumbing and Drainage A & A Works in the Renovation
Chinachem Group
Hong Kong Baptist University - Supply of 4 nos of sump pump panel
Supply of 4 nos of sump pump panel for Hong Kong Baptist University
Hong Kong Baptist University
Hong Kong Sports Institute
Complete plumbing & drainage installations, centralized hot water system and solar panel installation for the 3-storey New Facilities Building, located between the HKSI Rowing Centre and the Swimming Complex. It houses Table-Tennis Hall and Karate Hall, as well as two Fitness Training Centers, providing athletes with ample training space
Hong Kong Sports Institute Ltd
Majestic Square, 4 Mong Kok Road, Tai Kok Tsui
Complete plumbing & drainage installation for the commercial building development of Southland, consisting of 22-storey commercial floors with retail at Ground Floor and 2-levels of basement carparks
CNQC International Holdings Limted
Beacon Peak, Shek Kip Mei
Complete plumbing & drainage installation for the residential project of Shimao Property, consisting of 6 residential towers of 332 flats and 26 houses with car parks.
Shimao Property Holdings Limited
ARUNA (弦岸), Apleichau
Complete plumbing & drainage installation for the residential project of Chuang's Consortium, consisting of a 21-storey residential tower (105 flats), on top of 4-storey podium with ground floor lobby & retail shops at G/F, F&B at 1/F, and Club House and swimming pool at 3/F. The 1-level basement is provided with plant rooms.
Chuang's Consortium International Limited
Grand Mayfair 1 (柏瓏 I) , Kam Sheung Road
Complete plumbing & drainage installation for the residential project at West Rail Kam Sheung Road Station, consisting of four 16-storey residential towers (715 flats) with club house, swimming pool and basement car park.
China Overseas Holdings Limited
2C Boundary Road, Mongkok
Complete plumbing & drainage installation for the 26-storey residential tower of 42 flats with retail and club house.
Lofter Group
Aberdeen Market cum Cooked Food Centre - Plumbing and Drainage Installations in Modernization
Aberdeen Market cum Cooked Food Centre - Plumbing and Drainage Installations in Modernization
Architectural Services Department
One Victoria - various A & A Maintenance Works
One Victoria - various A & A maintenance works
China Overseas Holdings Limited
Lee Garden 3 - various A & A maintenance works
Lee Garden 3 - various A & A maintenance works
Tower Watson Hong Kong Limited
77 Peak Road - various A & A maintenance works
77 Peak Road - various A & A maintenance works
Wharf Peak Properties Ltd
官塘資本大厦 - various A & A maintenance works
官塘資本大厦 - various A & A maintenance works
Favor Fast Ltd.
Swire Coca-Cola HK Ltd - various A & A maintenance works
Swire Coca-Cola HK Ltd - various A & A maintenance works
Swire Coca-Cola Hong Kong Ltd
粉嶺浸信會呂明才幼稚園 - various A & A maintenance works
粉嶺浸信會呂明才幼稚園 -various A & A maintenance works
粉嶺浸信會呂明才幼稚園
饒宗頤文化館 - various A & A maintenance works
饒宗頤文化館 - various A & A maintenance works
饒宗頤文化館
Hong Kong Children's Hospital - Supply of dry pump impeller
Supply of dry pump impeller at Hong Kong Children's Hospital
Hong Kong Children's Hospital
77 Peak Road - maintenance pumping work at House 6 for two years
77 Peak Road - maintenance pumping work at House 6 for two years
Wharf Peak Properties Ltd
饒宗頤文化館-12個月保養
Organic Waste Treatment Facilities Phase 2
Complete plumbing and drainage installations for the Organic Waste Treatment Facilities Phase 2, now known as "Organic Resources Recovery Centre Phase 2 (O·PARK2)] at Sha Ling of North District
Environmental Protection Department
Eight Star Street (星街8號)
Complete plumbing & drainage installation for the residential project of Swire Properties, consisting of a 24-storey residential tower of 37 flats with club house and swimming pool.
Swire Properties Limited
The Aperture (皓日), Ngau Tau Kok Road
Complete plumbing & drainage installation for the residential project of Hang Lung Properties, consisting of a 39-storey tower (294 flats), including one level basement carpark, 3 level podium, 31-storey residential tower and 4 mechanical floors at roof.
Hang Lung Properties Limited
Mount Anderson (安峯)
Complete plumbing & drainage installation for the residential project of Chinachem Group, consisting of 4 residential towers of 10/ 20-storey (334 flats) with car parks, club house and swimming pool.
Chinachem Group
Harbour Grand Kowloon - Plumbing, Drainage and Fire Services A & A Works in Renovation of Guestrooms
Harbour Grand Kowloon - Plumbing, Drainage and Fire Services A & A Works in Renovation of Guestrooms
Hutchison Whampoa Properties Limited
Community Isolation & Treatment Facilities Site at Kai Tak
Complete plumbing and drainage installations for the Community Isolation & Treatment Facilities at Kai Tak which are 4-storey and installed with lifts, consisting of about 3,000 pre-fabricated units
Architectural Services Department
Community Isolation & Treatment Facilities Site at HKZMB Artificial Island
Complete plumbing and drainage installations for the Community Isolation & Treatment Facilities at Artificial Island of Hong Kong-Zhuhai-Macao Bridge, consisting of more than 400 modular box houses
Architectural Services Department
Community Isolation & Treatment Facilities Site at Ma Sik Road
Complete plumbing and drainage installations for the Community Isolation & Treatment Facilities at Artificial Island consisting of about 350 modular box houses
Architectural Services Department
TWGHs Tsoi Wing Sing Primary School
Complete plumbing and drainage installations for the 30-classrooms Primary School in Shui Chuen O, Shatin
Architect ASD
Kee Wah Production Centre
Complete plumbing & drainage installation for the 5-storey industrial building of Kee Wah Production Centre in Tai Po Industrial Centre
Kee Wah Group Ltd.
11 Plantation Road - Modification of Underground Drainage Works
11 Plantation Road - Modification of Underground Drainage Works
Wharf Peak Properties Ltd
Salvation Army Centaline Charity Fund Queen's Hill School
Complete plumbing and drainage installations for a 7-storey school in Queen’s Hill, comprising of 30 classrooms, 6 special rooms, student activity center, assembly hall, library and ancillary offices
Architect ASD
Maryknoll Secondary School
Complete plumbing and drainage installations for the 30-classrooms Secondary School at Anderson Road, Kwun Tong
Architect ASD
The Burrow, Sang Po Kong
Complete plumbing & drainage installation for the commercial building development of Hong Kong Pacific Investments Ltd., consisting of 27-storey commercial floor with 18 floors (Office), 5 floors (Retail) and 3 floors (Carpark)
Hong Kong Pacific Investments Limited (HKPI)
Villa Lucca (林海山城)
Complete plumbing & drainage installation for the low-density luxury residential project of Hysan & HKR International, consisting of 262 garden houses and apartments with car parks, club house and swimming pool.
Hysan Development Company Limited
HKU Li Ka Shing Faculty of Medicine
Complete plumbing and drainage installations for the Medical Complex Extension at 21 Sassoon Road of HKU, consisting of a 3-storey New Annex built on the existing Tang Court and a 2-storey rooftop extension at existing William MW Mong Block
University of Hong Kong
Open University
Complete plumbing and drainage installations for the 1-level basement and 12-storey superstructure
Open University of Hong Kong
Tseung Kwan O InnoPark, Tseung Kwan O Industrial Estate
Complete plumbing & drainage installation for the commercial development of HKSTP, consisting of an 11-storey office tower and a 2-storey podium that includes retail shops, dining area, professional convention and exhibition venue, green roof and a basement of carparks
The Hong Kong Science Parks and Technology Corporation
Maya (曦臺), Yau Tong
Complete plumbing & drainage installation for the residential project of Wang On Properties, consisting of 2 towers (326 flats) with a podium of carparks, retail shops and club house.
Wang On Properties Ltd.
No.15 SHOUSON (壽臣山15號)
Complete plumbing & drainage installation for the low-density luxury residential project of Emperor Group, consisting of 15 houses with car parks and swimming pools.
Emperor Holdings Limited
CLP Queen's Hill 132kV Substation
Complete plumbing and drainage installations for a CLP 132kV Substation, consisting of a single-storey accommodating LV Transformer Room & L.V. Switch Room, a 2-storey block accommodating 132kV/11kV Transformer Bays, 11kV Switchgear Room, 11kV Capacitor Room, Telecommunication Room, Battery & Charger Room
China Light and Power (Hong Kong) Ltd
Mount Verdant (翠嶺峰), Tiu Keng Leng
Complete plumbing & drainage installation for the Subsidized Sales Flats project of Hong Kong Housing Society, consisting of a 33-storey residential tower (330 flats) on top of a 3-storey podium of GIC, Kindergarten, ground floor lobby and 1-storey basement of carparks.
Hong Kong Housing Society
HSBC - Plumbing & Drainage A & A Works in Headquarter Building
HSBC - Plumbing & Drainage A & A Works in Headquarter Building
HSBC
Hong Kong Museum of Art - Plumbing & Drainage Installations in Expansion and Renovation
Plumbing & Drainage Installations in Expansion and Renovation of Hong Kong Museum of Art
Architectural Services Department
Hoi Lai Children Development Centre
Complete plumbing and drainage installations for the Special School for children with mild intellectual disability at Hoi Lai Estate
Open University of Hong Kong
Kwai Chung Hospital (Phase 1)
Complete plumbing and drainage installation for the project, which comprises Demolition of all existing buildings, construction of a new Main Block and Child Block, construction of a lift tower on Lai King Hill Road with a link bridge to connect the Main Block, and all alteration and addition works affected by the redevelopment works
Hospital Authority
Harbour Grand Kowloon Hotel
Complete plumbing & drainage system and centralized hot water system for the hotel project of Hutchison Whampao Properties, which comprises a 5-storey office extension on existing Block 1, and a 10-storey hotel extension on existing Block 2
Hutchison Whampoa Properties Limited
The Silveri
Complete plumbing & drainage system and centralized hot water system for the hotel project of Newfoundworld Ltd. (Hang Lung, Henderson, New World, Sun Hung Kai and Swire), which comprises a 18-storey hotel & retail complex, and the alteration & addition works of a 5-storey retail complex
Newfoundworld Investment Holdings Limited
Ocean Park Marriott Hotel
Complete plumbing & drainage system and centralized hot water system for a Marriott hotel project next to Ocean Park, which comprises a 7-storey hotel & retail complex
Lai Sun Group
YWCA Summit View Kowloon
Complete plumbing & drainage system for a hostel comprising health care and sports facilities at 1/F -5/F and 150 hostel rooms at 6/F – 20/F
YWCA (Young Women’s Christian Association of Hong Kong)
Mapletree Logistics Hub Tsing Yi
Complete plumbing & drainage installation for the commercial development of an 11-storey ramp-up Grade A logistics facility
Kongwell Logistics Ltd.
Revitalization & Conservation for the Former Fan Ling Magistracy
Complete plumbing and drainage installations for The Hong Kong Federation of Youth Groups (HKFYG) Leadership Institute to carry out the revitalization and conservation of the former Fan Ling Magistracy
The HKFYG Institute for Leadership Development Ltd
SUNeVision Data Centre
Complete plumbing & drainage installation for the high-tier data center of SUNeVision
Sun Hung Kai Properties Ltd.
Lee Garden Three
Complete plumbing & drainage installation for the commercial building development of Hysan Development, consisting of 21-storey (Office), 3-storey (Retail) and basement of 5-storey (Carpark).
Hysan Development Company Limited
11 Plantation Road (種植道11號)
Complete plumbing & drainage installation for the low-density luxury residential project of Wharf Properties, consisting of 7 houses.
Wharf Peak Properties Ltd
77 Peak Road
Complete plumbing & drainage installation for the low-density luxury residential project of Wharf Properties, consisting of 8 houses.
Wharf Peak Properties Ltd
King's Hill (眀徳山), Sai Ying Pun
Complete plumbing & drainage installation for the residential project of Sun Hung Kai Properties, consisting of a tower (166 apartments) with retail shops, club house and car parks.
Sun Hung Kai Properties Ltd.
St. Moritz (雲端), Kau To Shan
Complete plumbing & drainage installation for the low-density luxury residential project of Sun Hung Kai Properties, consisting of 59 apartments in 24 houses and 3 blocks with club house, swimming pool and car parks.
Sun Hung Kai Properties Ltd.
CX Catering Services Facility
Complete plumbing and drainage installations for Cathay Pacific Catering Services Facility Phase 2 Expansion of HK International Airport. The project comprised a 3-storey building, 1-level lower ground floor and two bridges linking the new and the existing catering facilities
Cathay Pacific Airways Limited
Hong Kong Children's Hospital
Complete plumbing and drainage installation for the Centre of Excellence in Paediatrics of the Hospital Authority, which has 468 beds for inpatients and day-patients, providing mainly tertiary services for complex and rare paediatric cases
Hospital Authority
Kerry Hotel
Complete plumbing & drainage system and centralized hot water system for a hotel project operated by Shangri-La Hotel, which comprises a 17-storey hotel, 3-storey Food & Beverage and 3-storey BOH
Shangri-La Hotel (Kowloon) Ltd.
Heya Aqua (喜漾), Cheung Sha Wan
Complete plumbing & drainage installation for the Urban Renewal project of Hong Kong Housing Society, consisting of two 33-storey residential tower (275 flats) on top of a podium of ground floor lobby, retail and carparks.
Hong Kong Housing Society
The Nova (星鑽), Sai Ying Pun
Complete plumbing & drainage installation for the residential project of URA & China Overseas, consisting of residential floors starting from 1/F to 35/F (255 flats). The residents’ clubhouse is on the 36/F and the rooftop includes an outdoor swimming pool, gym and children’s playroom. Parking spaces are located on the ground floor to 1-level Basement.
Urban Renewal Authority
Homantin Hillside (何文田山畔)
Complete plumbing & drainage installation for the residential project of Wing Tai Properties & Nan Fung Group, consisting of 2 Blocks (173 flats).
Nan Fung Group
The Morgan (敦皓), Conduit Road
Complete plumbing & drainage installation for a residential project of Phoenix Property Investors, consisting of one residential tower (111 flats) on top of a podium of ground floor lobby, club house, retail and car parks.
Phoenix Property Investors (HK) Ltd.
Contact Us

An error has occurred somewhere and it is not possible to submit the form. Please try again later or contact us via email.


_theaustin_main.jpg)




%201.jpg)





















%201.jpg)













%201.jpg)










%201.webp)












%201.jpg)



%202.jpg)





%201.jpg)





%201.jpg)

%202.jpg)





%201.jpg)

%202.jpg)